RISC 2008 premium structure - Arabica - Kerala

Adimalli State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
800 2438 1245.00 1245 1399
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
800
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 850 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 850 mm or more

1050 mm or more

1270 mm or more
3000




5000




8000
890
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 2490
 
Chundale State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
1000 2165 1100.00 1100 1236
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
600
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 580 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 580 mm or more

700 mm or more

825 mm or more
3000




5000




8000
600
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 2200
 
Idukki State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
800 2800 1437.50 1438 1615
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
800
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 650 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 650 mm or more

780 mm or more

910 mm or more
3000




5000




8000
1275
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 2875
 
Kalpetta State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
800 2875 1450.00 1450 1629
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
1000
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 530 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 530 mm or more

630 mm or more

750 mm or more
3000




5000




8000
1100
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 2900
 
Katapanna State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
800 2100 1075.00 1075 1208
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
500
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 450 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 450 mm or more

570 mm or more

690 mm or more
3000




5000




8000
850
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 2150
 
Kollegonde State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
4700 6720 2500.00 4273 4801
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
1173
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 325 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 325 mm or more

425 mm or more

550 mm or more
3000




5000




8000
900
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 6773
 
Manthavady State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
2023 3677 1860.50 1861 2090
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
950
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 550 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 550 mm or more

675 mm or more

800 mm or more
3000




5000




8000
748
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 3721
 
Meenangadi State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
800 1966 1004.50 1005 1129
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
480
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 360 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 360 mm or more

460 mm or more

560 mm or more
3000




5000




8000
729
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 3721
 
Munnar State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
1700 2980 1515.00 1515 1702
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
480
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 1075 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 1075 mm or more

1350 mm or more

1650 mm or more
3000




5000




8000
850
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 3030
 
Palakkad State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
2483 4469 2257.50 2257 2536
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
1269
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 480 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 480 mm or more

650 mm or more

800 mm or more
3000




5000




8000
762
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 4514
 
Panamaran State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
800 1982 1009.00 1009 1134
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
600
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 325 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 325 mm or more

425 mm or more

550 mm or more
3000




5000




8000
618
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 2018
 
Peermade State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
500 3253 1650.00 1650 1854
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
2000
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 800 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 800 mm or more

1000 mm or more

1200 mm or more
3000




5000




8000
800
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 3300
 
Pulpally State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
800 1780 905.50 906 1017
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
480
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 325 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 325 mm or more

425 mm or more

500 mm or more
3000




5000




8000
531
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 1811
 
S Bathery State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
800 1899 969.00 969 1089
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
480
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 350 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 350 mm or more

450 mm or more

550 mm or more
3000




5000




8000
658
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 1938
 
Vandiperiya State: Kerala
Option Period Condi-
tion
Max. Payout (Rs.) Trig-
gers & Payout slabs (Rs.)
Prem-
ium (Rs.)
Prem-
ium
for all
3
options
Sub-
sidy
Net prem payable by grower Prem with
S.T
.
Blos-
som Shower
1st
March
to 15th
April
The payout shall start if the cumulative rainfall is less than 25 mm in 7 consecutive days during the specified period. In case of multiple events and all are of less than 25 mm (over 7 consecutive days), the event with maximum rainfall would be considered. 16000 25 mm or more

<25 mm

<20 mm

<15 mm

<10 mm

<5 mm
0




2000


3000


5000


10000


16000
600 3234 1646 1646 1849
Backing Sho-
wers
From
18th day
of the
star-
ting of
blossom
rainafll
till
40th day.
Less than 12 mm in 2 consecutive days Precon-
dition:
Blossom shower, in the absence of 25 mm, a minimum of 5 mm shall be considered as fulfillment of Blossom Shower for the purpose of counting the Backing shower period, failing of which the period for Backing Showers shall be from 1st May till 19th May.
6000  

 

<12 mm

<8 mm

<5 mm
 

 

1000


2000


6000
1700
Monsoon Shower 1st Jun to 31st August Cumulative rainfall of more than 340 mm over 7 consecutive days (single event of highest rainfall is considered) 8000 340 mm or more

450 mm or more

560 mm or more
3000




5000




8000
992
Sum Insured/Maximum Payout (Rs) 30000 Premium (Rs) 3292